REACH%20STACKER%20CONVERSIONS_edited.jpg

CONVERTING EXISTING GAS VEHICLES TO ELECTRIC WITH ZERONOX ENGINEERING KITS

THE CONVERSION PROCESS

STEP 1 VEHICLE ASSESSMENT & PERFORMANCE REQUIREMENTS

planning vehicle design.jpg

It's always best to start with questions before providing answers.  Before a project can even begin our team of engineers assess your current vehicles design and determine the desired performance for a new complete power system. 

Retrofit.jpg

STEP 2 POWERTRAIN DESIGN, SOURCING & ASSEMBLY

Once the area limitations are measured and the performance has been determined our team of engineers go to work to source quality American, German, Chinese, and Taiwanese parts necessary to create a drive train that is cost efficient, powerful and maintenance free. Our team will work with your manufacturing plant to ensure your assembly line is properly retooled for the coming improvements.

STEP 3 BATTERY DESIGN, MANUFACTURING, AND PRODUCTION ENGINEERING 

battery design.jpg

Batteries custom built to the dimension requirements and your performance requirements are designed, manufactured and tested in cooperation with the new drivetrain.  The finished, tested batteries will then be manufactured and delivered to your manufacturing facility for final placement into your new upgraded vehicle. 

GET A FREE CONSULTATION

ON THE ELECTRIFICATION OF YOUR EXISTING HEAVY GAS FLEET

Type of Vehicle*

Thanks! Your request was recieved!

24 hr service.png
24 service color.png

TALK TO A TECH

DOWNLOAD COLOR.png
PDF Downloadpng.png

DOWNLOAD

A BROCHURE